Charged Reviews · Quick reference
Fox ESS CQ 80.35 Battery System
- Brand
- Fox ESS
- Model
- CQ 80.35
- SKU / part number
- ?
- Category
- Batteries
Energy and chemistry
| Nominal voltage | 256 V[1] |
|---|---|
| Rated capacity | ? |
| Nominal energy | ? |
| Usable energy | ? |
| Chemistry | ? |
| Cell format | ? |
Charge and discharge
| Continuous charge current | ? |
|---|---|
| Continuous discharge current | ? |
| Maximum charge current | ? |
| Maximum discharge current | ? |
| Peak charge current | ? |
| Peak discharge current | ? |
| Continuous output power | ? |
| Peak output | ? |
| Maximum charge voltage | ? |
| Charge cutoff voltage | ? |
| Discharge cutoff voltage | ? |
BMS and communication
| BMS continuous current | ? |
|---|---|
| Communication protocols | ? |
| Wireless monitoring | ? |
| Inverter compatibility | ? |
Operating temperature
| Charging temperature | ? |
|---|---|
| Discharging temperature | ? |
| Storage temperature | ? |
| Self-heating | ? |
Mechanical and mounting
| Dimensions | ? |
|---|---|
| Weight | ? |
| Terminals | ? |
| Mounting / format | ? |
| Enclosure rating (IP) | ? |
Installation (from the manual)
Torque
| Main terminal torque | 3 to 4 N·m(26.55 to 35.4 in-lb*)[1] |
|---|---|
| Communication terminal torque | ? |
| Ground terminal torque | ? |
Protection
| Fuse or breaker | PDF page 16: Battery protection: Internal Short Circuit, Over Voltage, Over Current, Over Temp, Under Voltage.; PDF page 34: The battery system includes an automatic low-temperature protection feature. it proactively manages. The battery to maintain adequate charge, extending standby time when temperatures drop.; PDF page 35: The CQ battery system has a non-reset table function to stop operation when one or more cells in the battery system deviate from the operating region during operation. This feature shall not be a user reset table or allow for automatic reset. Please ask after sales for help.; PDF page 31: Under voltage fault; PDF page 31: Over voltage fault; PDF page 31: Over temperature fault; PDF page 31: Under temperature fault; PDF page 31: Discharge over current; PDF page 31: Charge over current; PDF page 31: Pre-Charge failed; PDF page 31: AFE communication failed; PDF page 31: Module addressing failed; PDF page 31: BMU communication failed; PDF page 31: PCS communication failed; PDF page 31: HVB FUSE fault; PDF page 31: Module FUSE fault; PDF page 31: Power failed; PDF page 31: Internal total voltage sampling failed; PDF page 31: Temperature sampling failed; PDF page 31: Relay adhesion; PDF page 31: Relay not close; PDF page 31: Relay drive failed; PDF page 31: Single cell "0V" fault; PDF page 31: Temperature high permanent failed; PDF page 31: The single voltage high permanently failed; PDF page 31: SOH low protection; PDF page 31: AFE failed(UV/OV/UT/OT); PDF page 31: Shutdown failure; PDF page 31: Other fault[1] |
|---|
Clearances and orientation
| Installation clearances | PDF page 20, general prose: To ensure proper operation and long battery life, please make sure to leave at least 300mm of cooling space around the battery. Shading or insufficient space for heat dissipation will result in high battery temperatures, which may cause unplanned shutdowns and significantly shorten the service life of the battery.; PDF page 20, single-cluster 3D illustration: ≥50mm arrows, ≥300mm arrows (including top), 50mm between bases. Other direction labels are not invented.; PDF page 20, labeled three-cluster plan: Battery back clearance ≥300mm; Battery side clearance ≥300mm; Clearance between battery clusters ≥300mm; Battery front clearance ≥800mm; between bases 50mm.[1]Needs confirmation |
|---|---|
| Mounting orientation | PDF page 21: Position the base (Item R) on the floor at the distance shown in the figure below, and verify levelness using a spirit level.; PDF page 21: When placing the base, it is necessary to ensure that the distance between the bases is 50mm; Otherwise, the base-fixed metals (Item T) in Step 2 will not be able to be installed.; PDF page 22: Two methods are available for handling the battery pack: Method 1: Screw the solid handles (Item S) from the Accessory Package into the pre- tapped mounting holes on the battery pack. Method 2: Use the integral handle slots molded into the battery pack housing.; PDF page 22: By moving the position of the battery pack, the raised sphere on the base will bounce up and restrict the movement of the battery pack.; PDF page 22: Use front fixed sheet metals (Item P) to secure the battery pack and the base. Fix the battery packs at the bottom of the two columns using base-fixed metals (Item T).; PDF page 23: Select the appropriate stacking configuration based on the quantity of battery packs, then handle and stack the High-Voltage Control Box and all CQ16 in accordance with the selected arrangement. ② The upper and lower two battery packs are fixed with fixed grounding metals (Item E). ③ Connect the fixed grounding metals (Item E) between all the batteries. Note: Position the High-Voltage Control Box on the top of the battery packs in the rightmost column. The back of the battery also needs to be fixed.A total of four fixed grounding metals (Item E) are required between every two battery packs for fixation. The fixed grounding metals have the function of grounding connection. Please connect all the fixed grounding metals.[1] |
Grounding
| Grounding | PDF page 8: Please ensure that all the batteries are grounded properly.; PDF page 23: The upper and lower two battery packs are fixed with fixed grounding metals (Item E).; PDF page 23: Connect the fixed grounding metals (Item E) between all the batteries.; PDF page 23: The back of the battery also needs to be fixed.A total of four fixed grounding metals (Item E) are required between every two battery packs for fixation.; PDF page 23: The fixed grounding metals have the function of grounding connection. Please connect all the fixed grounding metals.; PDF page 26: Route communication cable (Item J) through right-side cable duct. Step 2 Route grounding cable (Item I) through right-side cable duct and secure with screw. Ensure firm and reliable connection. Step 3 Secure wiring cable with cable ties (Item C). Step 4 Reinstall decorative cover.[1] |
|---|
Communication
| Communication ports | PDF page 17: High-Voltage Control Box interface: BAT-: BAT negative terminal; PDF page 17: High-Voltage Control Box interface: DC Switch: Power switch, battery charge and discharge circuit switch; PDF page 17: High-Voltage Control Box interface: BAT+: BAT positive terminal; PDF page 17: High-Voltage Control Box interface: Power Switch: Battery charge and discharge circuit switch; PDF page 17: High-Voltage Control Box interface: Status LED / SOC LED: LED display specific alarm information and battery system power; PDF page 17: High-Voltage Control Box interface: COM: Communication interface with the battery pack; PDF page 17: High-Voltage Control Box interface: Handle: DC Switch Handle; PDF page 17: High-Voltage Control Box interface: CAN: Battery and inverter communication port; PDF page 17: High-Voltage Control Box interface: P-: High-Voltage Control Box negative terminal, connected to hybrid inverter's negative terminal; PDF page 17: High-Voltage Control Box interface: PE: Ground terminal, connected to the hybrid inverter; PDF page 17: High-Voltage Control Box interface: P+: High-Voltage Control Box positive terminal, connected to hybrid inverter's positive terminal; PDF page 24: Use communication cable(Item O)to connect the first battery "INCOM (white)" from the high-voltage box "OUTCOM (yellow)". The communication cable (Item O, U) between other battery packs are connected in sequence from "OUTCOM" to "INCOM". (Refer to the illustration below: Following the direction indicated by the arrows, insert the communication cables harness in the color sequence “yellow, white, yellow, white...”.) ② Use cable ties (Item C) to fix the cable. Note: When connecting cables, observe the installation diagram and pay attention to the direction of the communication cables. Otherwise, the products may not work properly. All wiring harnesses and brads supplied by FOX.; PDF page 27: High-Voltage Control Box external CAN pinout, PIN / Function Definitions: 1 A-START; 2 GND; 3 /; 4 BMS-CANL; 5 BMS-CANH; 6 BMS-CANH; 7 BMS-CANL; 8 /.; PDF page 30: High-Voltage Control Box: Status LED*1; SOC LED*4. The labels remain separate, with no summed total.; PDF page 30: SOC indication tables and native color/symbol layout are retained in the manual on PDF page 30; no unverified flattened symbol-to-color mapping is assigned.; PDF page 17: CQ16 module interface: BAT-: BAT negative terminal; PDF page 17: CQ16 module interface: BAT+: BAT positive terminal; PDF page 17: CQ16 module interface: Fan: Ventilation and heat dissipation; PDF page 17: CQ16 module interface: COM1: Connection position of battery module communication and power supply input; PDF page 17: CQ16 module interface: COM2: Connection position of battery module communication and power supply output; PDF page 17: CQ16 module interface: LED: Battery pack status display; PDF page 29: For CQ 16 Green LED Red LED Batteries Status On for 0.5s, Off for 0.5s On for 0.5s, Off for 0.5s Running in boot On for 0.1s, Off for 0.1s On for 0.1s, Off for 0.1s Upgrading On for 1s, Off for 1s Off Normal Working Off On for 1s, Off for 1s Alarm[1] |
|---|---|
| Address / DIP setting | ? |
Not in the manual: Conductors
System limits
| Maximum parallel units | ? |
|---|---|
| Series connection | ? |
| Maximum system energy | ? |
Page 1 of 2 · Installation values · ? means nothing is recordedAggregated, often community-reported information, not official documentation. Do not rely on it for installation, purchase or compliance decisions; always confirm values with the manufacturer’s official documentation. Charged Reviews accepts no responsibility for errors.