Charged ReviewsSaved 0Compare 0Login

Charged Reviews · Quick reference

SEG Solar SEG-630-BTZ-BG

Brand
SEG Solar
Model
SEG-630-BTZ-BG
SKU / part number
SEG-630-BTZ-BG Provisional [1]
Category
Solar panels

chargedreviews.com/panels/seg-solar-seg-630-btz-bg

Electrical at STC

Rated output (STC)
630 W [2] [1]
Module efficiency
22.54 % [2]
Voltage at max power (Vmp)
47.7 V [2] [3]
Current at max power (Imp)
13.21 A [2] [3]
Open-circuit voltage (Voc)
57.08 V [2] [3]
Short-circuit current (Isc)
13.86 A [2] [3]
Power tolerance
?

Temperature and system limits

Temperature coefficient, Pmax
-0.3 %/°C [2]
Temperature coefficient, Voc
-0.25 %/°C [2]
Temperature coefficient, Isc
0.046 %/°C [2]
Maximum system voltage
1,500 V [2] [3]
Maximum series fuse
?
NOCT / NMOT
?
Rated output at NMOT
?
Operating temperature
-40 to 85 °C / -40 to 185 °F converted [2]

Cells and construction

Cell technology
N-Type Mono-crystalline, 156 pcs (78 x 2) [2]
Cell count
156 cells [2]
Bifacial
yes [2] [1]
Bifaciality
?
Frame
Anodized aluminium alloy [2]
Front glass
2.0 mm AR coating heat strengthened glass [2]
Back cover
2.0 mm heat strengthened glass [2]
Panel format
?

Mechanical and connections

Dimensions
W 1,134 × H 2,465 × D 30 mm / W 44.65 × H 97.05 × D 1.2 in converted [2] [3]
Weight
34 kg / 75 lb converted [2] [3]
Connectors
MC4 or others [2]
Cable length
?
Junction box rating
?
Mounting
?
Design load, front
?
Design load, rear
?

Installation (from the manual)

Torque

Clamp or bolt torque
16 to 20 N·m [4]

Clearances and orientation

Mounting methods and clamp zones
Screw installation (Table 2): Four inner mounting holes, +5400/-2400 Pa; Clamp installation (Table 3), clamp length ≥80mm, Mounting rail cross the long side, L=A/4±50mm: +5400/-2400 Pa; Clamp installation (Table 3), clamp length ≥80mm, Mounting rail parallel the long side, L=A/4±50mm: +2400/-2400 Pa; Clamp installation (Table 3), clamp length ≥80mm, Mounting rail cross the short side, W=B/4±50mm: +2400/-2400 Pa; Clamp installation (Table 3), clamp length ≥80mm, Mounting rail parallel the short side, W=B/4±50mm: not given (/); Tracker installation (Table 4): Nextracker 400mm hole distance +1800/-1800 [4]

Grounding

Grounding
A bonding or toothed washer is required to make proper and reliable electrical grounding connection with the anodized aluminum frame.; Consider using a lay-in lug, rated for outdoor use, if the module grounding conductor is to be larger than 10 AWG. [4]

Not in the manual: Conductors

Page 1 of 2 · Installation values · ? means nothing is recordedAggregated, often community-reported information, not official documentation. Do not rely on it for installation, purchase or compliance decisions; always confirm values with the manufacturer’s official documentation. Charged Reviews accepts no responsibility for errors.

Charged Reviews · Quick reference

SEG Solar SEG-630-BTZ-BG · SEG-630-BTZ-BG

Warranty

Product warranty15 years[2]
Power warranty term30 years[2]
First-year degradation?
Annual degradation after year one?
Warranted final output?
Coverage conditions?
Remedy?
Labor and shipping?
Transfer to another owner?

Certifications and listings

UL 61730?
UL 1703?
IEC 61215?
IEC 61730?
IEC 62804?
CEC listing?
CECVerified listed as of snapshot [5]

Documents and sources

  1. SEG Solar 630W 156 Half-Cell 1500V N-Type Silver Bifacial Solar Panel, SEG-630-BTZ-BG Product page · Checked Sep 16, 2026 https://www.greentechrenewables.com/product/seg-solar-630w-156-half-cell-1500v-n-type-silver-bifacial-solar-panel-seg-630-btz-bg
  2. SEG Solar Yukon N SEG-XXX-BTZ-BG 156-cell datasheet Manufacturer datasheet (PDF) · Revision SEG_DS_EN_2026V1.0 · Checked Sep 19, 2026 https://www.segsolar.com/Public/Uploads/uploadfile/files/20260305/SEG620640BTZBG182EN.pdf
  3. SEG-630-BTZ-BG · Datasheet Datasheet · Checked Sep 16, 2026 https://cdn.myced.com/images/Products/ZZ0000/ZZ3098/00000/ZZ309800028_DS.pdf
  4. SEG Solar Installation Guide, Photovoltaic Module (Double-glass) (U.S. UL 61730 edition, 2026 V1.1) Installation manual · Revision 2026 V1.1 · Revised 2026-03 · Checked Oct 1, 2026 https://www.segsolar.com/Public/Uploads/uploadfile/files/20260326/SEGInstallationManualBGEN.pdf
  5. CEC PV Module List, official spreadsheet (data unchanged since October 1, 2026; downloaded October 11, 2026) Government equipment list (spreadsheet) · Revision Data unchanged since October 1, 2026 · Revised Oct 1, 2026 · Checked Oct 10, 2026 https://solarequipment.energy.ca.gov/Home/DownloadtoExcel?filename=PVModuleList

Unofficial reference. Information may be incorrect. This sheet aggregates the public sources listed above, much of it community-reported. It is not official manufacturer documentation, not an installation guide and not a compliance record. Community-reported values are checked against official manufacturer information before publication; we cannot guarantee accuracy or completeness. Do not rely on this sheet for installation, purchase or compliance decisions: always confirm every value with the manufacturer’s official documentation before buying, wiring or installing equipment. Charged Reviews accepts no responsibility for errors or omissions. Manufacturers can submit documents or corrections.

Page 2 of 2 · Charged Reviews LLC · chargedreviews.com/panels/seg-solar-seg-630-btz-bgSome links pay us a commission. That does not affect what we record.