chargedreviews.com/panels/rec-group-rec345tp72
Electrical at STC
- Power tolerance
- ?
Temperature and system limits
Cells and construction
Mechanical and connections
Installation (from the manual)
Torque
- Clamp or bolt torque
- 21.7 N·m [1]
Conductors
- Cable bending radius / connector notes
- The cables on the REC TwinPeak 72 have a minimum bending radius of 30 mm to avoid damage to the insulation (Fig. 10) [1]
Clearances and orientation
- Mounting methods and clamp zones
- Mounting utilizing clamps on the two long sides of the panel have been found to be in compliance with IEC 61215 & IEC 61730 requirements for a maximum design load of 550 kg/m² (5400 Pa) downward force and 244 kg/m² (2400 Pa) upwards force (fig. 4).; Clamps must be fully located and secured between 235 - 335 mm from the corner of the frame closest to the panel corner.; REC TwinPeak 72 panels are not certified for installation through the use of clamps on the short side of the panel.; Installation of REC TwinPeak 72 panels using mounting holes complies with IEC 61215 & IEC 61730 requirements for a maximum load of 550 kg/m² (5400 Pa) downward force and 244 kg/m² (2400 Pa) upwards force. [1]
Grounding
- Grounding