AC output

Continuous output
12 kW [1] [2]
Peak output
2 x Pn for 0.5 s (VA) [1]
AC configuration
120/240 V, 120/208 V [1]
AC output voltage
?
AC frequency
?
Grid pass-through
?
Maximum output per leg
?

Battery

Battery voltage
48 V [1] [2]
Battery voltage range
40 to 60 V [1] [2]
Maximum charge current
?
Maximum discharge current
?
Battery-only output
?
Maximum grid charging
?
Compatible batteries / BMS
?

PV input

PV array limit (connected)
25 kW [1] [2]
PV input limit (converted)
?
Maximum PV voltage (Voc)
?
MPPT voltage range
?
MPPT trackers
3 [1] [2]
String inputs per MPPT
?
PV current per MPPT
?
PV short-circuit current
?
PV startup voltage
?

Efficiency and modes

Peak efficiency
97.5 % [1]
CEC weighted efficiency
?
Battery conversion efficiency
94 % [1] [2]
Grid / off-grid modes
?
Generator input
Generator or AC coupling (2 pole): up to 90Aac depending on generator size [3]
Transfer time
?
Idle consumption
60 W [1] [2]
Parallel units
?

Communication and environment

Communications
?
Operating temperature
?
Enclosure rating
NEMA4X [1]
Operating noise
?

Mechanical

Dimensions
W 566 × H 893 × D 285 mm / W 22.3 × H 35.2 × D 11.2 in converted [4]
Weight
57 kg / 130 lb converted [1] [2]

Installation (from the manual)

Torque

AC terminal torque
?
Battery terminal torque
9 to 18 N·m [3]
PV terminal torque
?
Ground terminal torque
?

Conductors

Battery conductors
1/0-4/0 AWG [3]
AC input conductors
3-2 AWG (whole home 100AMP AC passthrough); 2/0-3/0 AWG (whole home 200AMP AC passthrough); 6-3/0 AWG (partial backup) [3]
AC output conductors
2/0-3/0 AWG (load output) [3]
PV conductors
10-6 AWG [3]
Ground conductor
?

Protection

AC input breaker
Grid breaker (2 pole): 200Aac for whole home AC passthrough and or whole home backup on a 200A panel; 100Aac on a 100A panel; 60Aac when EPS are used for partial backup and exporting power is less than 12kW; 80Aac when exporting power is more than 12kW [3]
AC output breaker
Included load breaker (2 pole), 1 qty 200Aac [3]
Battery fuse or breaker
Battery breaker, 2 qty 200Adc (integrated) [3]
PV disconnect
PV fuse breakers (1 pole) (optional): 550V/20Adc per MPPT string [3]

Clearances and orientation

Installation clearances
?
Mounting orientation
The inverter should be installed upright on a vertical surface. [3]

Not in the manual: Grounding, Communication

Page 1 of 2 · Installation values · ? means nothing is recordedAggregated, often community-reported information, not official documentation. Do not rely on it for installation, purchase or compliance decisions; always confirm values with the manufacturer’s official documentation. Charged Reviews accepts no responsibility for errors.

Charged Reviews · Quick reference

Fortress Power Envy Duo 21 · Envy Duo 21

Warranty

Warranty term10 years[5]
Optional extension?
Coverage starts?
Coverage conditions?
Remedy?
Labor and shipping?
Transfer to another owner?
Registration?
Territory?

Certifications and listings

UL 1741Claimed present at observation [1]Claimed present at observation [1]
UL 1741 SAClaimed present at observation [1]
UL 1741 SBClaimed present at observation [1]
IEEE 1547Claimed present at observation [1]Claimed present at observation [1]
CA Rule 21?
UL 9540Claimed present at observation [1]
FCC Part 15?
CSA C22.2#107.1Claimed present at observation [1]
CSA C22.2#330Claimed present at observation [1]
FCC Part 15, Class BClaimed present at observation [1]
IEEE 2030.5Claimed present at observation [1]

Documents and sources

  1. Fortress Power datasheet Datasheet · Checked Sep 15, 2026 https://www.fortresspower.com/download/884/envy-duo-21/47810/fortress-power-envy-duo-21-data-sheet-english.pdf
  2. Fortress Power Envy Duo 21 product identity manufacturer · Checked Sep 15, 2026 https://www.fortresspower.com/products/envy-duo21/
  3. Fortress Power Envy Duo 21 | Installation Manual (English) Manufacturer instruction manual (PDF) · Checked Sep 19, 2026 https://www.fortresspower.com/download/884/envy-duo-21/47822/fortress-power-envy-duo-21-installation-manual-english.pdf
  4. Fortress Power product page — Fortress Power Envy Duo 21 Inverter Manufacturer product specification page (HTML capture) · Checked Sep 19, 2026 https://www.fortresspower.com/products/envy-duo21/
  5. Fortress Power Envy Duo 21 | Warranty (English) Manufacturer warranty document (PDF) · Checked Sep 19, 2026 https://www.fortresspower.com/download/884/envy-duo-21/47824/fortress-power-envy-duo-21-warranty-english.pdf

Unofficial reference. Information may be incorrect. This sheet aggregates the public sources listed above, much of it community-reported. It is not official manufacturer documentation, not an installation guide and not a compliance record. Community-reported values are checked against official manufacturer information before publication; we cannot guarantee accuracy or completeness. Do not rely on this sheet for installation, purchase or compliance decisions: always confirm every value with the manufacturer’s official documentation before buying, wiring or installing equipment. Charged Reviews accepts no responsibility for errors or omissions. Manufacturers can submit documents or corrections.