Charged Reviews · Quick reference
SunGoldPower CoreX 5 Pro
- Brand
- SunGoldPower
- Model
- CoreX 5 Pro
- SKU / part number
- CoreX 5 Pro [1]
- Category
- Batteries
chargedreviews.com/batteries/sungoldpower-corex-5-pro
Energy and chemistry
Charge and discharge
BMS and communication
Operating temperature
Mechanical and mounting
Installation (from the manual)
Torque
- Main terminal torque
- ?
- Communication terminal torque
- ?
- Ground terminal torque
- 3.5 N·m [2]
Clearances and orientation
- Installation clearances
- For multiple units in parallel, the clearance between adjacent battery enclosures shall not be less than 10 cm [2]
- Mounting orientation
- ?
Grounding
- Grounding
- All grounding points must be reliably grounded, with a system grounding resistance of < 4Ω [2]
Communication
- Communication ports
- RS485: For RS485 communication with PCS/inverter; CAN: For CAN communication with PCS/inverter; RS232: RS232 communication with host computer; RS485A: Parallel communication input; RS485B: Parallel communication output; Dry contact: Dry contact communication [2]
- Address / DIP setting
- ?
Not in the manual: Conductors, Protection